Start Date - 28th March 06
| |
We took over the building located in Kiveton Park, nr Sheffield with the brief to transform the two grond floor rooms into offices and the refurbish the 3 flats above.
| |
|
|
|
The previous owner had made a start on the refurbishing the property, however the project stopped back in 2005.
| |
|
|
|
The area had been cleared and some attention to the retaining wall undertaken, but still lots to do....
| |
|
|
|
Our brief was to strip out existing partition walls, damp proof the walls and replaster.....
| |
|
The front of the property is starting to take shape
| |
| |
|
The internal room have been replastered, painted and soon ready for occupation.
| |
| |
|
Getting to front area sorted out....
| |
| |
|
We removed the old broken shop front...
| |
| |